Central air-conditioning installation specification central air-conditioning installation flow chart

People who have installed central air-conditioning know that the installation of central air-conditioning is directly related to future use. Selecting a good brand of central air-conditioning can certainly guarantee product quality, but if the service providers looking for are not regular and unprofessional and standardized, it is inevitable that there will be regrets. Then, what is the standard construction process for central air-conditioning installation? Let's learn about it together.

1. Hanging machine

The first step for the construction team to enter the field is to lift the internal machine. Only pay attention to 2 points to avoid follow-up problems. a: The distance between the internal machine and the roof shall not be less than 1 cm to avoid resonance with the top of the wall when the machine is running. b: The internal machine lifting needs to consider the slope of 5/1000, and the condensate side should be slightly lower to prevent the condensate from draining out.

Infrared positioning: Determine the installation position based on the previously determined design drawings. To avoid misalignment, use a professional infrared locator to set the position.

Return air outlet: The home central air conditioner usually installs the return air outlet and the inspection inlet together. The air outlet size must be in line with the air outlet of the internal air compressor. Displacement cannot occur. Only in this way can the optimal return air volume be achieved, and sufficient maintenance space can be ensured.

Air outlet: The air outlet must not be installed near the light strip (Reason: If there is a light strip in front of the air outlet, it will cause the air conditioner to block the wind during heating, while the hot air is up, making hot air trapped in the upper part of the room. As a result, the entire event space feels lack of calories and takes a long time to feel warm.)

Guarantee level: After fixing, we must use a professional level to ensure that the internal machine is level, in order to ensure smooth drainage, no water in the water tray.

Protect the internal machine: Finally, remember to wrap the internal machine with plastic film and other materials to prevent dust from entering and affecting the normal operation of the machine.

Knowledge of building materials central air-conditioning air-conditioning purchase and decorating

1 234 Next> Total 4 Pages
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

3W High Power Lamp Beads

3W High Power Lamp Beads,Orange Hair Orange,Led 5Mm Orange,Led Purple Light

Dongguan XINYUDA Technology Co., Ltd. , https://www.gdxige.com