The Employer: _____ (hereinafter referred to as "Party A") and the Contractor: _____ (hereinafter referred to as "Party B") shall maintain the rights and interests of both parties and shall enter into this Contract in accordance with the existing laws, regulations and rules, and in conjunction with the specific circumstances of the Project. And follow the implementation.
Chapter One Contract Background
The first construction site is located in the _____ city _____ district _____ Road _____ Lane _____ No. _____ room, (hereinafter referred to as "the house"). The building was qualified for completion and has been delivered for use.
Article 2 Party A entrusts Party B with construction so that the house is safe, sanitary, beautiful, suitable for living, and convenient for life.
Chapter II Qualification of Construction Unit
Article 3 Party B is an enterprise legal person that has been approved by the administration of industry and commerce. After passing the latest annual inspection of the enterprise, it has the qualifications for engaging in the decoration of civil buildings approved by the construction administrative authority, and the qualification level meets the requirements of the construction. If Party B does not have the qualifications for operation or the corresponding qualifications, Party A has the right to terminate the contract. Party B shall immediately return the fees Party A has paid and compensate Party B for losses.
Article 4 Before this contract is signed, Party B shall present to Party A the original copy of Business License and Qualification Certificate.
Chapter III Construction Content
Article 5 The house belongs to the _____ structure, the room type is _____ room _____ Hall _____ kitchen _____ Guardian, the total building area is _____ square meters; the construction is one of the _____ rooms _ ____ Hall _____ kitchen _____ Wei, construction area is _____ square meters. For details, please refer to the “Red Line†section of the “House Map†as an attachment (1) to this contract.
Article 6 The construction contents and practices are described as follows (not enough to be attached):
(1) Office: Ground Section _____, Wall Section _____, Sky Shed Section _____, Door/Window Section _____, Other _____;
(b) Housing: Ground Section _____, Wall Section _____, Sky Shed Section _____, Door/Window Section _____, Other _____;
(3) Kitchen: Ground Section _____, Wall Section _____, Ceiling Section _____, Door/Window Section _____, Other _____;
(d) Guardian: Ground section _____, Wall section _____, Ceiling section _____, Door and window section _____, Other _____;
(5) Miscellaneous: Ground Section _____, Wall Section _____, Ceiling Section _____, Door/Window Section _____, Other _____; Where there is no description in the preceding paragraph, it is deemed as “Renovation Construction Drawing†of Annex (2) to this contract. determine.
Chapter IV Materials, Equipment and Prices
Article 7 Materials and equipment used for construction are listed in the “Quotation Sheet for Main Materials†as attachment (III) to this contract and the “Assembly Material Quotation Sheet†as attachment to this contract (IV). The labor costs of Party B are seen as attachments to this contract ( 5) "Labor Cost Quotation".
Article 8 to Article 13 apply when Party B provides materials, equipment and services for construction use
Article 8 The total price of the housing project is _____yuan, including the material fee _____ yuan, labor cost _____ yuan, management fee _____ yuan, design fee _____ yuan, garbage clearance freight _____ Yuan, tax _____ yuan, other costs _____ yuan. The total project price is the sum of the sub-items.
The total price and sub-item described in the preceding paragraph are the budget prices of Party B. If the settlement price exceeds the budget price, Party A shall pay the total project price according to the budget price; if the settlement price is lower than the budget price, Party A shall pay the total project price at the settlement price. Article 9 Party B's quotations for material costs, labor costs, management fees, design fees, and garbage clearance fees shall not exceed the market average price of the fees at the time of signing the contract.
If Party B’s offer in this contract exceeds the average market price, it shall be settled at the average market price.
If both parties object to the average market price mentioned in the preceding paragraph, they may entrust the price appraisal department to evaluate and the appraisal conclusion of the price appraisal department shall be accepted by both parties.
Decoration Contract Decoration Design Door Price Decorating House Decorating Project Budget Plan Decoration Finding Decoration Company Okay Bathroom Door Bathroom Design Toilet Design Toilet Waterproof Price Public Toilet Bathroom Waterproof Toilet Leakage Decoration Contract Template
Aluminum Combination Open Cell Ceiling System
Aluminum Combination Open Cell Ceiling System,Cell Ceiling,Suspended Ceiling Grid,Ceiling Grid Systems
Foshan Nanhai Lianxing Deli Decoration Materials Co.,Ltd , https://www.tuodeli.net