New House Renovation Notes on Hydropower and Precautions for Hydropower Construction

In home renovation, hydropower reform can be said to be the most important, because hydropower reform plays an important role in our lives, and these hydropower reforms are often called hidden projects and are concealed if they are renovated. If something goes wrong, then it will be a very bad thing. If you do not pay attention to the decoration, it is easy to bring a lot of trouble to the future life. But do you know about hydropower reform precautions? Xiao Bian will introduce here the relevant knowledge of the new house to change the water and electricity precautions , I hope to be able to help everyone.

Hydroelectricity Modification Notice II. Circuit Section

First, the design of the circuit must be determined in detail after considering the possibility, feasibility and availability. No one wants to pull wires on the floor of a new home. At the same time, the circuit design should also pay attention to its flexibility, and sometimes it should not be too "consummate." The death is resisted to sum up a relatively simple principle: In the more concentrated position of the electrical plug considers connecting a plug-in board in the future, the effect is often better than setting up the plug with full wall;

Second, the location of the socket is very important, often the outlet is just behind the bedside cabinet, resulting in the cabinet can not rely on the situation of the wall. It is generally not wrong to let the outlet be as close as possible, but if you leave the location of the outlet improperly, it may conflict with the placement of the furniture or the installation of the electrical appliance in the later period. Students must remember;

Third, the bedroom ceiling lights can be considered double control (bedside and entrance); some kitchen sockets or switch with the convenience of, in order to avoid, for example, the future of rice cooker plugs often have to pull to pull the inconvenience. Living room ceiling lights can be installed according to the needs of living and distribution switch (into the hall and back to the main bedroom door);

Fourth, how to charge the cassette must be said in advance, this is the most hidden and darkest profit point of the water circuit transformation. A cassette market is also one or two dollars, while the decoration team often charges more than ten dollars, and the average home improvement needs a small number of cassettes to be five or sixty. Therefore, it is normal for students to throw a few hundred dollars for this.

Xinxiang buy decoration decoration must see: new house hydropower transformation precautions (the most detailed)

1. Pay attention to observing whether there is a module in the telephone socket and the network cable socket. The space with the mirror and the coat hook should consider the lighting near the mirror; the surrounding audio cable should be buried when the circuit is reformed.

2, the living room, master bedroom, bathroom should be based on personal habits and convenience to consider the default telephone line; behind the TV does not need to set too many outlets, it is best to later even a patch panel on the side of the TV. Note that strong and weak wires cannot be in the same pipe and there will be interference;

3, if the living room, kitchen, bathroom, if the tile, some locations can be properly considered without slot routing;

4, exhaust fan switch, telephone socket should be installed near the toilet, rather than into the wall of the bathroom door; bathroom heater should be considered close to the shower room or bath position, rather than installed in the center of the bathroom;

Hydroelectricity Modification Precautions I. Waterway Section

First, the waterway design must first think of all the water-related equipment, such as: water purifiers, water heaters, kitchen treasures, toilets and wash basins, their location, installation methods and whether the need for hot water; to think ahead of the use of gas Electric water heaters, to avoid the temporary replacement of water heaters, resulting in repeated alterations to the waterway;

Second, the suppression test is best to have the presence of the owners, can play a supervisory role; because some decoration team will deceive the owners in this section. The method is: When the pressure is applied, open the “return valve” of the pressure pump to form a loop. Although the pressure pump seems to work, there is not much pressure in the tube. Especially for the electric pressure pump, the students should pay more attention. If you don’t understand, ask a professional to help you look at it.

Third, if you want to close the excess floor drain, be sure to block the gap between the drain pipe and the floor drain to prevent water overflow; the bathroom is not only left to wash basins, toilets, washing machines and other outlets, it is best to pick one up, then pick up Water mopping is very convenient; it depends on everyone in the owner who likes the problem.

Fourth, there should be pressure test after the waterway reform, but now many of the decoration team did not suppress the test. They will lie to you in many ways, saying nothing to suppress, there is pressure in the pipes, and so on. After the location of the washing machine is determined, the drainage of the washing machine can be considered to be a wall inside the drainage pipe, which is beautiful and convenient; it is particularly important that the floor drain of the washing machine is best not to use the deep water sealing floor drain, the drainage speed of the washing machine is very fast, the drainage volume is large, and the deep water seal The water discharge rate of the floor drain cannot be satisfied at all, and the result will directly lead to the overflow of the water.

5. When checking in, you should check whether each drain in the kitchen and bathroom is open. If the drain is slow, you should promptly clear the property. During the renovation, you should protect the drain, especially during the tiled kitchen and bathroom. Falling into the drain leads to blockage;

When the waterway is reformed, there are four points that should be noted for the installation of electric hot water heaters, sub-tap and other cold and hot water supply pipes.

1. The height of the hot and cold water nozzles is the same;

2, cold, hot water pipe nozzle should be higher than the wall two centimeters, shop walls should also be asked bricklayers finished after the completion of wall tiles to ensure the same level of wall tiles and water pipes. If the size is not appropriate, after installation of electric water heaters, sub-tap, etc., it may be necessary to purchase an additional pipe hoop, inner wire and other connectors to complete the installation;

3, cold, hot water supply pipe vertical wall surface, after the wall tile should also be careful not to let the bricklayer get it wrong (not vertical, then the installation can be strenuous);

4, to ensure that the spacing of 15 cm (now most of the electric water heaters, sub-water tap water hot and cold water are 15 cm, there are individual 10 cm);

Hydropower construction should be cautious

Nowadays, material management in the building materials market is not standardized. When purchasing electricity and water materials such as wires, switches, lamps, water supply pipes, etc., do not plan to use cheaper products. Buy regular factory products, and carefully check the product's production license, business license, test report, and 3C. Information such as certification is complete, and an official invoice must be issued. In the hydropower construction process, the following points are mainly noted:

1. Do not damage the original wire piping or plumbing piping when drilling holes. When the electrical conduit is laid, it is necessary to thread the conduit. Do not bury the wire directly on the ground or in the wall. This is not only unsafe, but it cannot be repaired once it is damaged. After the plumbing pipe is applied, the plumbing pipe must be pressure tested. After the pipe is qualified, the next process is performed to prevent the pipe from leaking and causing damage.

2, the kitchen and bathroom, etc. need to do waterproof parts, after the completion of the water must be closed water test, after passing qualifying.

3, wire connectors must be tinned, kitchen and bathroom fittings recommended to do waterproofing, joints can be used high-pressure self-adhesive tape and black tape for dressing.

4. Lamps with a weight of more than 3 kilograms must be fixed on bolts or embedded hooks. It is forbidden to use wooden wedges to fix them; the metal shell of lamps with installation height less than 2.4 meters must be protected grounded, and the toilet must use waterproof sockets.

Hydroelectric construction mainly pays attention to four aspects

1, the design should be reasonable. The direction of the water circuit should be reasonable, safe, practical and protective.

2, the material to be qualified. Hydropower materials should be regular brand products.

3, construction should be standardized. All wires must be piped, elbows must be used at the joints, and the ground must be handled as specified.

4, acceptance should be rigorous. All hydropower construction techniques must be in place and meet the construction specifications.

Summary: The relevant information on the consideration of new houses and hydropower and the matters needing attention for hydropower construction are introduced here. I hope this article will help everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.

Hydropower installation hydropower reform

Polishing Machine

polishing machine,polishing machine,polishing machine

Jiangmen Gude Polishing Equipment Co., Ltd , https://www.kokipolishing.com