1. The quality of the monitoring rod is made of high-quality low-carbon steel type Q235A produced by Shanghai Baosteel. The silicon content of the steel is not higher than 0.04%. After a large bending machine is bent at one time, the straightness error does not exceed 0.05%, and the monitoring rod's wind resistance According to the design of 36.9 meters/second over 11 levels, the seismic intensity is 8 grades.
2. The total height of the rod body is 6 meters, the upper diameter is 90mm, the lower diameter is 100mm, and the wall thickness is 4mm. There is a flange at the bottom of the lamp post, and the mounting distance of the flange is 200mm. It is installed on the foundation through the anchor bolts. (The ground anchor is a parameter set by the user, or it is configured by the company as usual)
3. The monitoring rod welding method is automatic submerged arc welding, reliable welding, smooth surface, no obvious welding defects such as pores, welding tumors, undercuts, etc. Ultrasonic flaw detection inspection, up to welding GBl1345 II standard requirements.
4. Anti-corrosion treatment of the camera pole adopts internal and external hot-dip galvanizing. The galvanizing process is followed by pickling, hot-dip galvanizing, water washing, phosphating, and passivation. The galvanized layer has smooth and beautiful surface, uniform gloss, no wrinkle, and flow. Fall and zinc tumors, peeling, spots,
Defects such as yin and yang exist, the thickness of the zinc layer is more than 86um, in line with the national standard GB/T13912-92, the adhesion of the galvanized layer meets the requirements of GB2694-88, and the antiseptic life is more than 30 years.
5, monitoring camera pole hot-dip galvanized after electrostatic spray (color optional), before the spray to scrub to increase adhesion, spray process to strictly control the curing time and temperature, to ensure uniform plastic layer, smooth, non-porous . The thickness of the sprayed layer is 1Ooum, the adhesion is up to GB9286-880, the surface is smooth, and the hardness is 2H.
2. The total height of the rod body is 6 meters, the upper diameter is 90mm, the lower diameter is 100mm, and the wall thickness is 4mm. There is a flange at the bottom of the lamp post, and the mounting distance of the flange is 200mm. It is installed on the foundation through the anchor bolts. (The ground anchor is a parameter set by the user, or it is configured by the company as usual)
3. The monitoring rod welding method is automatic submerged arc welding, reliable welding, smooth surface, no obvious welding defects such as pores, welding tumors, undercuts, etc. Ultrasonic flaw detection inspection, up to welding GBl1345 II standard requirements.
4. Anti-corrosion treatment of the camera pole adopts internal and external hot-dip galvanizing. The galvanizing process is followed by pickling, hot-dip galvanizing, water washing, phosphating, and passivation. The galvanized layer has smooth and beautiful surface, uniform gloss, no wrinkle, and flow. Fall and zinc tumors, peeling, spots,
Defects such as yin and yang exist, the thickness of the zinc layer is more than 86um, in line with the national standard GB/T13912-92, the adhesion of the galvanized layer meets the requirements of GB2694-88, and the antiseptic life is more than 30 years.
5, monitoring camera pole hot-dip galvanized after electrostatic spray (color optional), before the spray to scrub to increase adhesion, spray process to strictly control the curing time and temperature, to ensure uniform plastic layer, smooth, non-porous . The thickness of the sprayed layer is 1Ooum, the adhesion is up to GB9286-880, the surface is smooth, and the hardness is 2H.
Chemical Pump,Chemical Dosing Pump,Chemical Transfer Pump,Chemical Injection Pump
Hengshui Yuanhan Trading Co.,Ltd , https://www.hengshuiyuanhanpump.com