Although there are many finished products for sale now, a large part of people still prefer to buy rough houses because it can be used freely according to their own ideas, so as to achieve the desired effect of their own hearts, and more importantly, the price of such houses. Than the finished product will be much more affordable. What are the steps to decorate the rough house ? Let the master teacher tell you, let's take a look.
Decoration rough room step 1, drawing design
Before the renovation of a new house, a design drawing should be drafted in advance so that each step can be carried out objectively and reasonably. Generally, this work will be completed by professional designers. After confirming the design drawings, it is necessary to confirm the decoration matters and budget expenses together with the decoration company. Only after both parties confirm the contract contents can they sign the contract. You can start construction.
Decoration rough room Step 2, determine the location of furniture, electrical appliances
Before the hydropower reform, the position of furniture and electrical appliances should be confirmed first, so that the position of the power supply and the direction of the waterway can be determined for future construction and use. In addition, the positions of switch sockets, lamps, refrigerators, washing machines, etc. must be determined first. Otherwise, once the wall tiles and floor tiles are all affixed, it is troublesome to change them again, which not only takes time and time, but also costs money.
Decoration rough room step 3, hydropower reform
After determining the location of furniture and electrical appliances, water and electricity are closely followed. This is the most important aspect of the renovation. In the same way, hydropower projects, once completed, are difficult and cumbersome to repair. Therefore, regardless of the constructor or the owner, this section must be extremely serious and careful.
Decoration blank room step 4, bricklayer and carpentry
The construction time of this part needs to be decided according to different space and craftsmanship. Bricklayers usually look like 8-30 days, but carpenters are now doing less, so it depends on the specific circumstances. However, after these two projects are completed, the owners are required to go to the site to do a good job of acceptance work so as not to affect the overall appearance and use.
Decoration blank room step 5, paint
Paint is also an indispensable step in the renovation. Today, latex paint and wood products are used in many ways because it is more environmentally friendly and does not harm the health of occupants. However, paint should also be determined according to the different needs of different regions, to avoid causing material waste. After this part is also completed, it is mainly used for cleaning and purchasing of subsequent items.
Decoration rough room step 6, installation
Only half of the previous projects were completed. The next thing the owner must do is to install doors, windows, cabinets, switch sockets, and floors. Only after these operations are completed, the renovation of the entire house is basically completed. Finally, after the owner has accepted the entire renovation project, he should pay the remaining amount.
Xiao Bian concludes: The above is the master introduced the decoration of the rough room steps . In fact, the rough room renovation is a big project, and although the owner has spent money to buy, but for the construction process related issues are still necessary to know. In this way, the decoration can achieve better results and at the same time serve as a supervisor.
Decoration blank room steps
Universal Disinfectant Controller
In many water treatment occasions, it is necessary to add disinfectants to the water to eliminate germs and microorganisms in the water. Such as water plants, swimming pools, industrial production processes, etc. After disinfection, there will be some residual substances in the water, such as residual chlorine, chlorine dioxide, ozone, etc. Daruifuno's universal disinfectant controller can be connected with disinfectant sensors such as online residual Chlorine Sensor , online Chlorine Dioxide Sensor, online Total Chlorine Sensor , online Hydrogen Peroxide Sensor, online Ozone Sensor , water bromine sensor, Peracetic Acid Sensor and other disinfectant sensors of film coating method to realize real-time continuous monitoring of water quality. The disinfectant controller has 2 relays by default, 1 channel of 4-20mA current and RS485 digital interface, and supports Modbus communication protocol. We are a manufacturer of disinfectant controllers, we provide many different kinds of water quality analysis instruments. If you are interested in our products, please contact us.
Universal Disinfectant Controller,Amperometric Chlorine Analyzer,Chlorine Meter,Residual Chlorine Meter
Suzhou Delfino Environmental Technology Co., Ltd. , https://www.daruifuno.com