Do you want to do these preparations if you want the decoration to go smoothly?

The decoration involves many aspects, and there are many things that need to be prepared before the start of construction. 1 Before the retrial of the decoration budget section is resumed, it is recommended that the owner re-examine the decoration budget.
Almost all home renovations will eventually result in budget overruns. In order to reduce over-expenditure, after the end of the year, the owners should carefully review the current financial status of the family and allocate funds for the subsequent renovation. Some households may be financially strained due to Spring Festival expenditures or new family conditions. They also need to adjust their decoration budgets in a timely manner and reduce some of the dispensable construction projects or control materials.
2 Careful Design Alternatives Many owners who renovate during the Spring Festival will have new ideas for the decoration during the Spring Festival. They would like to make changes to the decoration design during the renovation of the year.
It is important to note that small renovation changes may add icing on the overall effect, but the drastic changes in the overall plan will inevitably result in additions or deductions to the original contract. The decoration costs will also change, and rushing to change the original mature design may also damage the overall situation. As a result, decoration disputes may also arise and bring unnecessary troubles. Therefore, it is recommended not to make major changes.
3 When the contractor returned to work to check the construction site at the time of the previous year, the formal home improvement company basically agreed with the owner on the date of resumption of work. On the day of the resumption of work, project managers, construction workers, and owners were required to arrive at the site to unveil closure seals.
After opening the seal, the owner needs to carefully check the conditions of the site, including the use of water, electricity, gas, etc.; whether the doors and windows are in good condition and whether the protection of the finished product is appropriate.
4 Checking the quality of materials When the work was stopped before the year ended, the decoration company and the owner needed to check the construction site, register the on-site items and decoration materials. After resuming work after the year, it is necessary to first inventory the decoration materials to see if the number of on-site materials is the same as that on the registration book.
Materials that have entered the field years ago, especially cement, gypsum powder, etc., are stored in a high-humidity environment and are prone to caking and solidification. If the cement material has a shelf life, it is difficult to guarantee the strength of the expired material structure, and it is recommended to replace such materials.
In addition, latex and paint materials should be disassembled and viewed, and ice-cold water-soluble glues and coating materials must not be used. Therefore, if the quality of the stored material is a problem, it is necessary to repurchase new materials. 5 Acceptance of project quality One of the reasons why many people choose to go through the decoration year after year is that, after a period of shelving, the problems in the renovation project are easily exposed after the holiday and repaired in a timely manner.
Therefore, the suspension of work years ago requires the signing of a good suspension agreement, the appointment of acceptance items after the year, and the handling of problems found. After the resumption of work after the year, the completed renovation project will be inspected. If any problem is found, the construction party can be notified so that it can be repaired promptly and repaired after completion to avoid unnecessary losses.
6 After signing the rework agreement , after checking the site conditions, decoration materials, and project quality, it is determined that there are no problems. Then the formal approach is to sign a resumption agreement. The agreement should include the time for reopening and reopening, project progress and arrangements, and site conditions. , inventory of items, signed by both the project manager and the owner. After signing, the site can be resumed in accordance with the agreement to continue home improvement project construction.

Decoration process is ready for renovation

Solar Footlight

Solar Footlight,Waterproof Led Flood Light,Effciency Solar Flood Light,High Effciency Solar Flood Light

JIANGMEN MOSCOT OPTOELECTRONIC TECHNOLOGY CO.,LTD. , https://www.sensorsled.com